Hydrogen production at hydroelectric power plant
Basic engineering of a green hydrogen production project from the combination with a hydroelectric power plant (1 MW).
The project included the technical-economic feasibility study, the calculation of costs, the selection of storage and the transportation methods to the final consumer (2022).
![H2 HPP – 2](https://synerhy.com/wp-content/uploads/2022/07/H2-HPP-2.jpg)
<
Previous
HMS – Toledo
Next
CTM – SEnergy I
>